What logs should be collected before asking for technical help?
Troubleshooting threads often begin with only a screenshot and 'it does not work.' What is the minimum evidence that makes a LiDAR issue reproducible without exposing confidential site…
\n\n\n\n\n\n\n\n\n\n
Troubleshooting threads often begin with only a screenshot and 'it does not work.' What is the minimum evidence that makes a LiDAR issue reproducible without exposing confidential site…
Fusion works at startup, but the projected LiDAR points gradually move relative to the camera image. Both streams continue without obvious packet loss. What timing evidence should I…
Would a monthly summary of solved installation and integration topics be useful? The roundup could link to existing discussions, highlight reproducible diagnostic methods and avoid republishing product claims…
A replacement cable connects physically, but the Ethernet link LED remains off. The original cable works. Which details should be checked before suspecting the scanner?
During heavy rain, sparse short-lived points appear in an outdoor monitoring zone. I want to reduce nuisance detections without delaying detection of an approaching vehicle.
A scanner occasionally loses useful returns after cold equipment enters a warm, humid area. The optical surface appears fogged. What should be inspected before changing detection thresholds?
After installing the LiDAR inside its protective housing, a curved band of points appears near the sensor. It was not present during the open-air test. The front window…
Fixed walls appear to move a few centimeters over several hours. Network timing is stable, so I suspect the mounting structure. How would you confirm whether vibration or…
A scanner near a machine guard occasionally reports points on or behind the glass. Cleaning helps only temporarily. What installation changes are most useful before attempting software filtering?
The LiDAR stream is stable while the conveyor is idle, but packets are lost when the motor starts. The sensor and industrial PC remain powered. Which checks would…
Before applying power, I check supply voltage at the device end, polarity, protective earth or functional ground, connector seating and network addressing. What else should be included so…